冷再生机使用前要做好哪方面的准备

来源:/ 日期:2023-07-07 发布人:
1、冷再生施工租赁场地准备
1. Preparation of rental site for cold regeneration construction
(1)直接填筑的路基基底,施工前必需经过检查签证;需求停止地基处置的基底必需完成各项处置,并满足地基处置的请求。
(1) The roadbed base directly filled must undergo inspection and certification before construction; The foundation that requires cessation of foundation disposal must complete all disposal tasks and meet the requirements for foundation disposal.
(2)场地应该保证足够的平整度,满足设备、人员进场请求。
(2) The site should ensure sufficient flatness to meet the requirements for equipment and personnel entry.
(3)做好场地的暂时排水和防雨措施。依照施工运量和施工机械的大荷载建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. According to the construction traffic volume and construction machinery, a large load construction road is constructed.
冷再生机租赁
2、技术准备
2. Technical preparation
冷再生机租赁厂家提醒您要做好相关人员的技术培训和技术交底工作,使参与施工的全体人员充沛认识高速铁路路基填筑的关键技术、质量控制要点。
The manufacturer of the cold recycling machine reminds you to provide technical training and disclosure to relevant personnel, so that all personnel involved in the construction can fully understand the key technologies and quality control points of high-speed railway roadbed filling.
3、劳动力、机械设备配置人员、机械设备应依据施工计划组合工期请求停止合理的配置。路堤填筑区为一个完好的作业区,每个作业区人员配置:施工队长1名,领工员2名,指挥卸土位置人员2名,丈量及实验检测人员4~6人,其他机械工、普工20~30人。
3. Labor force, mechanical equipment allocation personnel, and mechanical equipment should be requested to stop reasonable allocation based on the construction plan and construction period. The embankment filling area is a complete operation area, with one construction team leader, two foremen, two personnel commanding the unloading position, 4-6 measuring and experimental testing personnel, and 20-30 other mechanical and general workers in each operation area.
依据施工需求,每个作业面装备反铲发掘机一台、宣化-140推土机一台、YZ-22振动压路机两台、天工-160平地机一台,徐工-230灰土拌和机,自卸运输车6辆,撒水车一台备用。当运距较远时,自卸车的数量可恰当增加
According to the construction requirements, each working face is equipped with one backhoe excavator, one Xuanhua 140 bulldozer, two YZ-22 vibratory rollers, one Tiangong 160 Grader, XCMG 230 lime soil mixer, six dump trucks and one sprinkler for standby. When the transportation distance is far, the number of Dump truck can be appropriately increased
冷再生机使用前要做好哪方面的准备相关内容就讲解到这里了,希望能够给您好的帮助,更多事项就来我们网站咨询吧!
That's all we need to do before using the cold recycling machine. We hope it can be helpful to you. For more information, please come to our website Consult!

阅读/ Recommended reading

  冷再生机和路拌机在路面施工及维修中各有其独特的功能和适用场景,它们之间的主要区别体现在以下几个方面:  Cold recycling machines and road mi...

冷再生机出租对道路施工行业的影响 2024-12-18
如何选择冷再生机出租服务 2024-12-16
冷再生机出租:道路施工的新选择 2024-12-11
冷再生机租赁在土壤稳定中的应用与优势 2024-12-09

产品/ Recommended products