针对冷再生机从零到整的安装步骤

来源:/ 日期:2023-01-04 发布人:
冷再生机在施工过程中会有大量的灰尘落到再生机的表面,包括施工中沾污的油迹等污染物,影响不算小,所以要注意清洁保养,在此之前,您知道它怎么从零到整的安装起来吗?下面冷再生机租赁厂家为您讲解一番。
During the construction of the cold regenerator, a large amount of dust will fall on the surface of the regenerator, including pollutants such as oil stains during the construction. The impact is not small, so pay attention to cleaning and maintenance. Before that, do you know how to install the cold regenerator from zero to full? Next, the cold regeneration machine rental manufacturer will explain it to you.
1、将设备启动移已选好场地,将转子罩弹簧销轴取出,再将转子放置低点,切记不可悬置或有吃力现象,造成大臂油缸销轴取不出来,油管泄压易出危险。
1. Move the equipment to the selected site, take out the spring pin shaft of the rotor cover, and then place the rotor at a low point. Remember not to suspend or have difficulty, which will cause the pin shaft of the boom oil cylinder not to be taken out, and the oil pipe pressure relief is easy to be dangerous.
2、拆卸油管和转子马达的保护罩壳。
2. Remove the oil pipe and the protective cover of the rotor motor.
3、将马达到工作泵的6根油管在大臂连接处全部拆卸开,并用卫生纸和塑料带将接口全部封紧,预防进入灰尘及杂物,并取下连接钢管。
3. Disassemble all 6 oil pipes from the motor to the working pump at the connection of the boom, seal all the interfaces with toilet paper and plastic tape to prevent dust and debris from entering, and remove the connecting steel pipes.
4、卸掉马达上的螺栓,并取下马达,注意需要两个人须轻拿轻放。
4. Remove the bolts on the motor and take down the motor. It requires two people to handle it with care.
5、将转子罩壳所有的连接杆拆卸,取下销轴。
5. Dismantle all connecting rods of the rotor housing and take down the pin shaft.
6、将连接两个大臂与固定横杆上的螺栓拆卸掉,只留两边上面的4个。
6. Remove the bolts connecting the two booms and the fixed crossbar, leaving only four on both sides.
7、拆掉横杆和车体连接的4个螺栓,上下面做好标记,方便安装。
7. Remove the four bolts connecting the crossbar and the vehicle body, and mark the upper and lower parts for installation.
冷再生机租赁
8、用吊车挂转子一侧的大臂处,另一侧挂马达后侧的销轴,先提升尽大量向一侧移动,然后将两根钢丝绳均挂到出来的那一侧,拖外面。
8. Use a crane to hang the boom on one side of the rotor and the pin shaft on the back side of the motor on the other side. First lift it and move it to one side as much as possible, then hang the two wire ropes to the side that comes out and drag them outside.
9、卸掉滑靴,吊出转子罩。
9. Remove the sliding shoes and lift out the rotor cover.
10、卸掉大臂与横杆和转子的连接处的螺栓,吊出大臂,放置一边。
10. Remove the bolts at the connection between the boom and the cross bar and the rotor, lift out the boom and put it aside.
11、卸掉减速机固定螺丝,并用撬棍插入轴套压住,用吊车吊出减速机,放置一边,检查有无渗漏现象。
11. Remove the fixing screws of the reducer, insert a crowbar into the shaft sleeve and press it down. Lift the reducer out with a crane and place it aside to check for leakage.
12、放开减速机的两个油堵,放净废油。因两个油堵成90度角,在加注新油时,减速机平放的基础上须让注油孔在高点,直到观察孔漏油为止,然后将油堵缠上生料带上紧,如油堵是无‘O’型圈的类型,需在生料带的外面涂抹密封胶,观察12小时后有无渗漏现象。
12. Release the two oil plugs of the reducer and drain off the waste oil. Since the two oil plugs form a 90 degree angle, when filling new oil, the oil filling hole must be kept at the high point on the basis of the reducer laid flat until the observation hole leaks oil, and then the oil plug is wrapped around the raw material belt and tightened. If the oil plug is of the type without an 'O' ring, it is necessary to apply sealant on the outside of the raw material belt, and observe whether there is leakage after 12 hours.
13、将以上步骤反之,安装完毕。在安装的过程中,大臂、马达、减速机的固定螺栓均需涂抹紧固胶,马达与减速机结合面涂抹密封胶。
13. Reverse the above steps to complete the installation. During installation, the fixing bolts of boom, motor and reducer shall be coated with fastening glue, and the joint surface of motor and reducer shall be coated with sealant.
安装完毕后,一定要进行试车过程,先收拾工具,清理现场。将设备开空场怠速运转,观察车况,无异常后将转子由慢到快均长时间运转观察一次,后找一处可施工的地点,观察设备工作情况,可短时间加大负荷量,无渗油及异响后,本次工作完成。更多相关内容就来我们网站进行咨询吧!
After the installation is completed, the commissioning process must be carried out. First, clean up the tools and the site. Open the equipment to the empty yard for idling operation, observe the vehicle condition, and then observe the rotor from slow to fast for a long time after no abnormality is found. Then find a place where construction can be carried out, observe the equipment working condition, and increase the load in a short time. After there is no oil leakage and abnormal noise, the work is completed. More relevant content will come to our website Consult!

阅读/ Recommended reading

  冷再生机和路拌机在路面施工及维修中各有其独特的功能和适用场景,它们之间的主要区别体现在以下几个方面:  Cold recycling machines and road mi...

冷再生机出租对道路施工行业的影响 2024-12-18
如何选择冷再生机出租服务 2024-12-16
冷再生机出租:道路施工的新选择 2024-12-11
冷再生机租赁在土壤稳定中的应用与优势 2024-12-09

产品/ Recommended products