首页>>新闻中心冷再生机的使用要有充分的施工准备

冷再生机的使用要有充分的施工准备

来源:/ 日期:2022-08-10 发布人:
施工现场管理贯穿于工程施工的全过程,充分的施工准备是管理好施工现场的基础。施工单位只有通过充分的施工准备,才能保障冷再生机施工过程的连续、协调、均衡和经济。冷再生机出租人员讲解在进行冷再生机施工准备工作中应注意以下问题:
Construction site management runs through the whole process of project construction, and adequate construction preparation is the basis for managing the construction site. Only through adequate construction preparation can the construction unit ensure the continuity, coordination, balance and economy of the construction process of the cold regenerator. The following issues shall be paid attention to during the construction preparation of the cold regenerator:
1.要建立严谨、规范的内部约束、考核、激励机制,用制度管人,用规章管理工程。
1. It is necessary to establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage the project with regulations.
2.要补充调查工程沿线影响施工的因素,标注出平面位置图,并进行、论证,写出调查报告,作为修订施工方案、编制施工控制预算的依据。
2. The factors affecting the construction along the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be made and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3.施工图纸,吃透设计意图,澄清图纸中的问题,恢复定线和施工放样。对所有控制点进行加密、保护、记录。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4.根据施工合同协议和现场调研认真编制施工控制预算,作为控制支出、进行成本预测分析、经济核算以及统计工程进度的依据。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and site investigation, as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.
冷再生机出租
5.进行业务、技术培训和技术交底,使相关人员对工程的技术标准、操作规程、质量控制、资料整理有的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6.建立工地试验室,并申请临时资质。对施工中拟使用的各种原材料取样试验,建立相关技术参数的数据库。
6. Establish a site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7.绘制关键工序施工工艺流程图和试验操作规程、质量检查评定、计量支付、设计变更、事故处理等操作管理框图,并使图表上墙。
7. Draw the key process construction process flow chart, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident treatment and other operation management block diagrams, and put the charts on the wall.
8.根据工期要求、技术标准、机械设备能力、材料供应、自然条件等进行综合分析,选择好的合适的施工方案,完善施工组织设计。
8. Conduct comprehensive analysis according to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., select a proper construction scheme and improve the construction organization design.
在施工过程中,要保持冷再生机机械组合的相对稳定。由于受进度、天气等方面的影响,机械使用数量发生变化时,现场管理者须适时改变机械组合。更多注意事项就来我们网站看看吧。
During the construction, the mechanical combination of the cold regenerator shall be kept relatively stable. Due to the influence of progress, weather and other aspects, when the number of machinery used changes, the site manager must change the machinery combination in time. For more information, please visit our website Let's see.

阅读/ Recommended reading

  作为路面施工装备中的一员 路拌/冷再生机一直以来均在路面解决方案里占有重要作用。而RS500路拌/冷再生机,作为一款性能出色的路面养护设备,更是行业里同类产品中的佼佼者。发动...

冷再生机租赁:就地冷再生施质量控制要点 2024-09-21
冷再生机租赁:维特根冷再生机W 240 CR,用途广泛显神功 2024-09-15
冷再生机租赁:就地冷再生施工技术的原理及其特点分析 2024-09-04
冷再生机租赁——保养注意事项 2024-09-02

产品/ Recommended products